Solar installation
Grid-tie, hybrid and off-grid solar for homes and businesses in Zambales and Pangasinan. We visit, design, install, and help with net metering.
Three kinds of system
The right one depends on your bill, when you use power, and how often brownouts hit your area. Full comparison.
| System | How it works | Power in a brownout? | Best for |
|---|---|---|---|
| Grid-tie | Panels feed your home and the grid together. No battery. | No. It switches off when the grid is down, for safety. | Lowest cost per kWh. Daytime users: offices, shops, homes with people in during the day. |
| Hybrid | Panels, the grid and a battery, managed by a hybrid inverter. | Yes. Chosen circuits keep running from the battery. | Homes and businesses that want lower bills and backup power during brownouts. |
| Off-grid | Panels and batteries only, no grid connection. | There is no grid to lose. You run on stored solar power. | Farms, resorts, beach houses and sites far from power lines. |
Homes and businesses
For homes
- Lower your monthly Meralco or electric co-op bill
- Keep lights, fans, the ref and Wi-Fi on in brownouts with a battery
- Layouts for GI sheet, long-span and concrete roofs
- App monitoring so you can see what your panels make
For businesses
- Cut daytime power costs for shops, offices, schools and resorts
- Farms and off-grid sites powered without a line connection
- Systems sized to your load, with room to add panels later
- Net metering support for systems up to 100 kW
Solar installation cost
The price of solar panel installation in the Philippines depends on six things. We price each one in your free written quote.
- System size in kWp, set by your bill. Estimate it with the solar calculator.
- Battery or not. A hybrid solar system with battery costs more than grid-tie, and keeps power on in brownouts.
- Roof type: GI sheet, long-span or concrete need different mounting.
- Equipment: panel, inverter and battery brand and size.
- Wiring distance from the roof to your panel board.
- Permits and net metering paperwork with your utility.
From roof to switch-on
Site visit
We check your roof, wiring and last bills, in person.
Design and quote
A written quote: system size, equipment and full price.
Installation
Our installers mount, wire and test the whole system.
Switch-on
We set up your app and help with net metering papers.
Where we install
Installation questions
Site visitWhat happens during the free site visit?
We check your roof type and condition, shade from trees and buildings, your panel board and wiring, and your recent electric bills. We also agree where the inverter and any battery will go. Then we prepare your written quote.
PermitsDo I need permits for solar panel installation?
Yes. Your LGU issues the electrical permit, and net metering needs the Certificate of Final Electrical Inspection (CFEI) as well. We prepare the documents with you and coordinate with your utility.
Add laterCan I start with grid-tie and add a battery later?
Yes, if we install a hybrid inverter from the start. It runs as grid-tie until you add the battery, so you avoid replacing the inverter later.
WhoDo you install for businesses, farms and resorts?
Yes. We install for homes, shops, offices, schools, farms and resorts, and off-grid systems for sites far from power lines.
More answers, with the numbers worked out, in our solar guides.
Get your free quote
- Free site visit in Zambales and Pangasinan
- Written quote, no obligation
- We reply within one working day
[TODO: phone / Viber]